Installation, operation, maintenance and service continuity for the simulator, and how responsibilities are split between the customer and Yoy.
Addressed to the person in charge of the simulator and to the Organization's IT team. If you are looking for what each party is responsible for, go straight to section 05; if you need to enable the network or prepare the room, the details of domains, ports and power are in the Network and Infrastructure Technical Requirements.
The vast majority of components can be found on the open market, which makes immediate replacement straightforward, but some are manufactured by Yoy itself. In those cases you will need to contact Yoy and request a quote for replacement or repair. Response time in this case will depend on stock levels.
A fresh configuration requires contacting Yoy.
If the system fails due to a fault in the simulator itself, reconfiguration is covered by the warranty or the maintenance contract.
This configuration may or may not carry a cost, depending on the contracts in force and the location.
A "Standalone" version (self-contained executable) of the simulator would be provided. This version removes validation against Yoy's servers, allowing the software to run locally and permanently.
A repository (physical or digital) would be made available with the installation files and dependencies needed to reinstall the system from scratch without help from the Yoy team.
Drawings, circuit schematics and relevant code would be provided so that the component can be reproduced.
Yoy provides detailed technical documentation that allows any new person in charge to configure, calibrate and launch the simulator.
Yoy is available to run training sessions for new staff as needed. These sessions may or may not carry a cost, depending on the contracts in force and the location.
We always recommend running a technical handover session with at least two people on the team, to ensure the knowledge does not rest with a single person.
Minimum and recommended hardware and software requirements, and guidelines regarding modifications, dependencies and management of system updates.
| Component | Requirement |
|---|---|
| Processor | Intel Core i7 or higher (or AMD Ryzen equivalent). |
| Graphics card | Nvidia 4070, 5060 or higher, with a TGP of at least 110 W. Alternatives: 3080, 4080, 5070. |
| Storage | SSD 512 GB or more. |
| RAM | 16 GB or more. |
| Ports | 1 HDMI. At least 2 USB ports. |
| Certification (desirable) | MIL-STD-810H for mining. |
We recommend not modifying the original configuration of the high-end PC, in order to guarantee the correct operation of the simulation system.
That said, we understand that some organizations need to integrate corporate security software, apply domain policies or make changes to the operating system in order to connect the equipment to their internal networks. These procedures are the customer's responsibility and may affect the simulator's operation.
We recommend that any modification be carried out in advance and coordinated beforehand, so that its compatibility with the system can be validated. Costs arising from reconfiguration caused by external modifications may be subject to the contractual conditions in force.
Updates may include improvements or fixes and will be coordinated by the support team with the person in charge of the simulator in advance. They are typically performed remotely and take between 5 minutes and 1 hour. The internet requirements detailed in the Network and Infrastructure Technical Requirements document must be in place.
Minimum physical, electrical and connectivity infrastructure requirements to guarantee operational stability, equipment safety and service continuity. The full detail of domains, ports and power is in the Network and Infrastructure Technical Requirements document; a summary follows.
https://accounts.yoy.cl (port 443) must be allowed, in addition to the Meta Quest support and update domains — see sections 01-02 of the Network and Infrastructure Technical Requirements.
To avoid operational ambiguity, what falls to each party is set out below.
| Area | Detail |
|---|---|
| Customer | |
| Power point, working earth connection and UPS | Provision of electrical infrastructure as per section 04. |
| Physical space and environmental conditions | Room/space as per section 04. |
| Internet connectivity and domain whitelisting | Enabling the domains/ports listed in the Network and Infrastructure Technical Requirements on their corporate firewall/proxy. |
| Modifications to the high-end PC configuration (domains, VPN, corporate antivirus) | Under their responsibility; may require prior coordination with Yoy — see section 03. |
| Training and day-to-day operation of the simulator | With initial training and technical handover provided by Yoy (section 02). |
| Shared | |
| Simulator hardware (high-end PC, headset, peripherals) | Yoy supplies and specifies the hardware; the customer safeguards it day to day. |
| Yoy | |
| Simulator software, licences and updates | Development, maintenance and deployment of updates. |
| Technical support and corrective maintenance of the simulator | Through the channels in section 08, subject to the contractual conditions in force. |
| Backups and cloud platform infrastructure (Yoy Account) | See the Security document. |
Yoy maintains an internal incident management process covering the infrastructure and applications that serve the simulator.
The simulator and the Yoy Account platform process personal data of instructors and students/operators in the normal course of their operation.
For technical detail on how this information is generated, stored, transmitted and consolidated, see the Security — Methodologies, Technologies and Communication document.
Service hours: Monday to Friday, 09:00 to 18:00 (Chile time).